To sell a house, an apartment or a plot of land, the seller must give the buyer several surveys, grouped in the technical survey file (dossier de diagnostic technique, DDT). The list depends on the date of construction, the age of the installations and the situation of the property. In Haute-Savoie, the rules are national; only certain local elements change, such as risk zones, drainage or the ground.

This article reviews the position for a seller in the Bas-Chablais: the surveys to plan for, how long they remain valid, when to hand them over and what you risk if you forget.

What is the technical survey file for?

The DDT informs the buyer about the condition of the property before they commit. The seller must attach it to the promise of sale (or, failing that, to the deed of sale). Its cost is borne by the seller, and each survey must be carried out by a certified surveyor. Using a surveyor who is not certified exposes you to a fine of €1,500 (€3,000 for a repeat offence).

Some documents must be handed over earlier: the DPE rating already appears in the listing, the risks statement is handed to the buyer at the first viewing and so is the energy audit, where required (see below).

Which surveys for which property?

Survey When it is required Validity at sale
DPE (energy performance) House of 50 m² or more; apartment, whatever the floor area 10 years (DPE carried out since 1 July 2021)
Energy audit Single-family house rated F or G (since 1 April 2023), E (since 1 January 2025), D (from 2034) 5 years
Asbestos Building permit issued before 1 July 1997 Unlimited
Lead (CREP) Home built before 1 January 1949 Unlimited if no lead (or under 1 mg/cm²), otherwise 1 year
Electricity Installation more than 15 years old Less than 3 years old at the promise or the deed
Gas Installation more than 15 years old Less than 3 years old at the promise or the deed
Non-mains drainage Home not connected to the public sewer Less than 3 years old at signing of the deed
Risks statement Property located in an area concerned (risk prevention plan, seismicity level 2 to 5, radon level 3…) 6 months
Termites Property located in an area defined by prefectoral order 6 months
Floor area measurement (Carrez law) Co-ownership lot Unlimited, unless works change the area

Other items may be added: a noise survey if the property is in an airport noise exposure zone, information on the risk of dry rot (mérule), the home information booklet (carnet d’information du logement, CIL) for works or authorisations since 1 January 2023. For an apartment, the file also includes the co-ownership documents: maintenance log, summary sheet, dated statement (état daté).

Particularities of the Bas-Chablais and Haute-Savoie

Natural risks

The risks statement is required as soon as the property is in a listed area: risk prevention plan (natural, mining, technological), seismicity zone level 2 to 5, radon level 3. It must be less than 6 months old at signing. According to the prefecture (page updated 23 September 2026), Haute-Savoie is classified in seismicity zone 4 (moderate), with the exception of a few communes in zone 3, including Saint-Julien-en-Genevois and Viry; no commune of the département is in zone 5. The communes of the Bas-Chablais are not among the exceptions: they therefore fall in zone 4. The risks statement also applies to land. Check the situation of your property on the Géorisques site (in French); the notary then checks the document.

Termites

According to the Haute-Savoie prefecture (page updated 25 June 2026), there is no prefectoral “termites” order in the département: no termite survey is therefore required on sale in the Bas-Chablais. The same page mentions a dry-rot zone without specifying its perimeter: for a sale, ask the prefecture or the notary.

Drainage

A home not connected to the public sewer must have an inspection by the non-mains sanitation service (SPANC), less than 3 years old at signing of the deed. If the installation does not comply, the works must be carried out within the year following the deed: by the seller, or by the buyer where they have been informed and buy as seen, in which case the works can be negotiated into the price. For a connected home, an inspection is only required if the mayor imposes it by order. Ask your town hall: the situation varies from one commune of the Bas-Chablais to another.

Building land and clay

The sale of undeveloped building land, located in a zone of moderate or high exposure to clay shrink-swell, requires a prior geotechnical study (Élan law, article 68). It is attached to the promise of sale and valid for 30 years. A new zoning, which widens the zones concerned, applies to promises and deeds signed from 1 July 2026. The BRGM map can be viewed on Géorisques. An operational planning certificate is not compulsory, but it helps you learn about the easements and requirements on the land.

DPE and energy audit: what is changing

The DPE of an electrically heated home was recalculated on 1 January 2026 and will be again in 2027: an old DPE can be updated free of charge, without a new visit. We set out these rules in The DPE in 2026: reform, letting ban and grants. For a single-family house rated E, F or G, the energy audit is added to the DPE: see Compulsory energy audit to sell a house. While waiting for works, simple measures limit the bill: should you heat unoccupied rooms?

When should the surveys be carried out?

It is better to order them before putting the property on the market: the DPE rating appears in the listing, and the risks statement and the audit must be handed over from the first viewing. This also lets you know the real condition of the property, plan any works and avoid a blockage at the promise stage.

Watch the durations: the risks statement (6 months) and any termite report must be valid at signing, sometimes several weeks after the property goes on the market. The other surveys, such as the DPE, remain valid for several years.

What do you risk without the surveys?

  • For the risks statement: the buyer can ask for the sale to be cancelled or the price reduced, with possible damages; the cooling-off period only starts after the document is handed over.
  • For asbestos, lead, electricity, gas and drainage: the seller cannot exclude the warranty against hidden defects, and may be held liable.
  • For an erroneous survey: the buyer can hold the surveyor liable.

The notary checks that the documents are present and valid before the promise of sale: an incomplete file delays signing.

How much do the surveys cost?

The fee is not regulated: it depends on the number of surveys required, the floor area and the layout of the property. Ask for several quotes from certified surveyors and check their certification on the Service-Public site. You can have the surveys done together by one firm.

How we support you

At Vue Lac et Montagnes, we help each seller to:

  • identify the surveys needed according to the property and the commune;
  • coordinate their completion with certified surveyors;
  • include the DDT in the sale file;
  • decide, with quotes to hand, on the works to carry out before the sale.

Contact us or request a free valuation. The steps that follow are set out in Selling a property: from purchase offer to deed of sale.

Frequently asked questions

How long is a survey valid?

It depends on the survey: 10 years for the DPE, 5 years for the energy audit, less than 3 years for electricity, gas and non-mains drainage, 6 months for the risks statement. Asbestos and the Carrez measurement have no time limit, nor does lead where no lead is found.

Can I reuse the surveys from my purchase?

Yes, if they are still valid at signing of the promise of sale or the deed. The risks statement, however, must be redone if it is more than 6 months old.

Can I sell without surveys if the buyer agrees?

No. The file is required by law. Without a valid survey, the seller cannot exclude the warranty against hidden defects for the risks concerned.

Do I need to redo my DPE after insulation work?

A DPE that is still valid remains valid, but insulation work may improve the rating: redoing the survey then lets you show it in the listing. For an electrically heated home, a free update is possible: see our review of the DPE.

Who pays for the surveys?

The seller, who gathers and finances the file.

Sources

Conclusion

The surveys depend on the age of the property, its installations and its situation: DPE, audit for a house rated E, F or G, asbestos, lead, electricity, gas, drainage, risks statement. Have them done early by a certified surveyor, bearing in mind that the risks statement is only valid for 6 months. Let's talk about your sale project: we help you list the surveys you need, compare quotes and present a complete file from the first viewing.

Free valuation

Free, no-obligation valuation, then support right through to the final sale deed (acte authentique).

Request a valuationContact the agency

Related articles