Skip to content

News · Planning and local development

Dividing a plot of land: steps, rules and precautions

Updated

Mountain lake surrounded by peaks with a location marker on a plot of land

A large plot, a house the children have left, a garden you no longer maintain: many owners in the Bas-Chablais wonder whether they can split off a building plot and sell it. It is possible, but it means a planning procedure, a land surveyor (géomètre-expert) and local rules to check before any promise of sale. In the Bas-Chablais, the planning document is the PLUi-HM of Thonon Agglomération: see what the PLUi-HM changes.

Sketch of a house drawn on a grassed plot, representing a building lot split off from a parcel

What is a land division?

A land division means cutting a plot into several lots. For planning purposes, what matters is the purpose of the lot: splitting off a lot intended for building is a subdivision (lotissement), even for a single lot, and requires authorisation. Splitting off a part that cannot be built on, or a plot intended to be attached to a neighbour’s property, is not a subdivision.

The division sets the boundary and creates a new parcel. It is not a building permit: each buyer will have to obtain their own permit, under the rules of the PLUi-HM.

Which authorisation to divide?

Situation Authorisation Processing time (complete file)
Building lots, with no shared road or facilities, outside a protected area Prior declaration of division 1 month
Creation of roads, spaces or facilities shared by the lots Development permit (permis d’aménager) 3 months (4 months in a protected area or if the CDPENAF is consulted)
Subdivision in a protected area (remarkable heritage site, surroundings of a listed monument, classified site) Development permit 4 months
You also submit the application to build the houses Building permit including division Building permit time
Splitting off a plot attached to a neighbour, or a plot with buildings that are kept In principle no subdivision authorisation –

A few points:

  • The number of lots is no longer the criterion: a single building lot split off from a property already falls under the prior declaration.
  • The town hall can oppose the declaration by a reasoned order. Its silence means no objection. For a development permit, the town hall has one month to point out an incomplete file.
  • Above 2,500 m² to be developed, an architect or a landscape architect is required for a subdivision.
  • A commune can also make the division of land not intended for building subject to declaration in certain zones (control of divisions, article L115-3 of the planning code): ask the town hall whether this is the case.
  • The prior declaration is valid for 3 years; if the division has not taken place within that period, the decision lapses. A development permit is valid for 3 years, with two possible one-year extensions.

The steps of the division, in order

1. Check feasibility. Consult the rules of the PLUi-HM: building zone or not, rules on siting, height, footprint, parking. The operational planning certificate (certificat d’urbanisme opérationnel), issued in 2 months by the town hall, indicates whether your project is feasible on the land; it is valid for 18 months and freezes the applicable rules during that time. The information planning certificate (1 month) only gives information on the rules and taxes.

2. Check access and utilities. The lot must be served: access to the road, water, electricity, drainage, emergency access. If access crosses another property, an easement must be arranged at the notary’s office. Cost the connections with the utility companies before setting the price.

3. Appoint a land surveyor (géomètre-expert). They carry out the boundary survey (bornage) (fixing the boundaries with neighbours), the division plan and the document amending the land register, which allows the land registry to number the new parcel. Ask for a quote before committing.

4. Submit the file to the town hall. Prior declaration of division (Cerfa form 16703) or development permit. If you are a legal entity in a commune of more than 3,500 inhabitants, the file must be submitted electronically only.

5. Display the authorisation on the land. Display starts the 2-month period for third-party appeals: see the timescales after authorisation.

6. Sell at the notary’s office. Once the authorisation has been obtained with no appeal, the notary prepares the deed. They do not carry out the planning formalities and work with the land surveyor.

Selling a building lot: what you need to know

  • Soil study. The sale of undeveloped building land located in a zone of moderate or high exposure to clay shrink-swell requires a prior geotechnical study, attached to the promise of sale: see the compulsory surveys.
  • No cooling-off period for the buyer of building land; the promise often includes a condition precedent of obtaining the building permit: see the steps of the sale.
  • Capital gains. The sale of building land is in principle taxable: 19% income tax and 17.2% social charges, with allowances according to length of ownership. The main-residence exemption does not automatically apply to the split-off land: have your case checked by the notary before signing. Details in our article on capital gains tax.
  • Value of the remaining house. Splitting off a lot reduces the land around the house; the effect on its value should be assessed before dividing. A valuation of the land and the house lets you compare the scenarios.

Precautions before you start

  • Do not sign any promise of sale before the non-opposition. A division made without authorisation exposes you to penalties, see what you risk without authorisation.
  • Ask for the operational planning certificate before paying the land surveyor: a refusal under the PLUi-HM would cost you less at this stage.
  • Read the zone rules: the PLUi-HM may have changed the classification of certain parcels.
  • Check the easements (right of way, utilities, views) in your title deed and with the notary.
  • Tell your neighbours: third-party appeals are possible for 2 months after display.

For a specific project in the Bas-Chablais, the estate agency Vue Lac et Montagnes in Messery helps you place the value of the land and the house. Contact us or request a valuation.

Frequently asked questions

Do I need authorisation to sell part of my garden?

Yes if the lot is intended for building: a prior declaration of division, or a development permit if shared roads or facilities are created. For a part that cannot be built on, no subdivision authorisation is required in principle, unless your commune has introduced control of divisions.

How long does it take to obtain the authorisation?

One month for the prior declaration, three months for the development permit, from a complete file. To this are added the land surveyor, the 2-month display and signing at the notary’s office.

Can the town hall refuse the division?

Yes, if the project does not comply with the rules of the PLUi-HM or if the opinions of the services consulted are unfavourable. The decision must be reasoned. A refusal can be challenged by an informal appeal, then before the administrative court within 2 months.

Is a land surveyor compulsory?

In practice yes: they carry out the boundary survey, the division plan and the land register document needed to create the new parcel.

Is a split-off lot necessarily buildable?

No. The division does not prejudge buildability. The building permit depends on the PLUi-HM, the servicing and the size of the lot. The operational planning certificate lets you check.

Sources

Conclusion

Before splitting off a lot, check three points: is the land buildable under the PLUi-HM, which authorisation do you need (prior declaration or development permit), and what will the tax on the sale be. An operational planning certificate and a land surveyor secure the project before any commitment.

Thinking of dividing your land? Talk to the agency before submitting anything: we help you estimate the value of the lot and of the remaining house.

Free valuation

Free, no-obligation valuation, or simply a conversation about your plans.

Request a valuationContact the agency

Related articles